BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-416@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20121127T000000
DTEND;TZID=Europe/Sarajevo:20121129T000000
DTSTAMP:20120719T141413Z
URL:https://navingo.prod.level-level.nl/events/wind-turbine-blade-manufact
 ure-2012/
SUMMARY:Wind Turbine Blade Manufacture 2012
DESCRIPTION:The event is conveniently located at the international airport.
  This is a very focused wind composites event and is well supported by the
  global industry. The demand for renewable energy is fuelling the growth o
 f the wind industry and the offshore market in particular is seeing great 
 potential for development. This is driving up the size of the windmill bla
 des to over 70m for the larger offshore turbines. There are hundreds of de
 sign factors to consider in these innovative composite structures from wei
 ght and load bearing\, which in turn places pressure on the tower\, to dur
 ability and weatherability in hostile environments.\nMore info: amiplastic
 s
LOCATION:Maritim Hotel\, 	Maritim Platz\, 1  40474 \, Düsseldorf\, Germany
GEO:51.2738092;6.742187100000024
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=	Maritim Platz\, 1  40474 \
 , Düsseldorf\, Germany;X-APPLE-RADIUS=100;X-TITLE=Maritim Hotel:geo:51.27
 38092,6.742187100000024
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:STANDARD
DTSTART:20121028T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
END:STANDARD
END:VTIMEZONE
END:VCALENDAR