BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-639@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20140124T000000
DTEND;TZID=Europe/Sarajevo:20140124T000000
DTSTAMP:20140108T153736Z
URL:https://navingo.prod.level-level.nl/events/vattenfall-supply-chain-inf
 ormation-day-2014/
SUMMARY:VATTENFALL Supply Chain Information Day 2014
DESCRIPTION:Vattenfall was granted a Development Consent Order by the Natio
 nal Planning Inspectorate in February 2013 giving Vattenfall the necessary
  permission to extend the existing Kentish Flats Offshore Wind Farm. At it
 s maximum installed capacity\, Kentish Flats Extension (“KFE”) will be
  capable of generating another 49.5 MW of additional electricity (the tota
 l annual electricity needs of up to 42\,194 UK households*). Vattenfall pl
 an to install 15 3.3MW turbines. Although Vattenfal has consent to instal
 l up to 17 turbines\, this number was reduced as higher rated turbines wil
 l be used. The Extension will be located 7.8km from the shore and cover ap
 proximately 7.77 sq km.\nMore info: kentinvictachamber
LOCATION:Darwin College University of Kent\,  Darwin College Canterbury\, C
 anterbury\,  CT2 7NY\, United Kingdom
GEO:51.2988614;1.0729331999999658
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS= Darwin College Canterbury\
 , Canterbury\,  CT2 7NY\, United Kingdom;X-APPLE-RADIUS=100;X-TITLE=Darwin
  College University of Kent:geo:51.2988614,1.0729331999999658
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:STANDARD
DTSTART:20131027T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
END:STANDARD
END:VTIMEZONE
END:VCALENDAR