BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-426@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20121018T000000
DTEND;TZID=Europe/Sarajevo:20121018T000000
DTSTAMP:20120820T092549Z
URL:https://navingo.prod.level-level.nl/events/offshore-wind-uk-engineerin
 g-and-manufacturing-supply-chains/
SUMMARY:Offshore Wind - UK Engineering and Manufacturing Supply Chains 
DESCRIPTION:Taking a medium scenario for offshore wind\, the UK can expect 
 to reach 18GW of installed offshore wind capacity by 2020 and 45GW by 2050
 . These achievements will only be possible through cost reduction measures
  and greater supply of local manufacture and engineering. Thousands of tur
 bines will be installed in the next few decades and a number of wind turbi
 ne OEMs have stated that UK manufacturing supply chains will be part of th
 eir business plans.\nMore info: envirolink
LOCATION:Chester St David's Village Hotel\, Ewloe\, Flintshire\, United Kin
 gdom
GEO:53.188496;-3.0482729999999947
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Ewloe\, Flintshire\, United
  Kingdom;X-APPLE-RADIUS=100;X-TITLE=Chester St David's Village Hotel:geo:5
 3.188496,-3.0482729999999947
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:DAYLIGHT
DTSTART:20120325T030000
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR