BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-464@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20130312T000000
DTEND;TZID=Europe/Sarajevo:20130313T000000
DTSTAMP:20130110T111341Z
URL:https://navingo.prod.level-level.nl/events/offshore-cable-installation
 -engineering-maintenance-forum/
SUMMARY:Offshore Cable Installation\, Engineering & Maintenance Forum 
DESCRIPTION:Cables are grounds for up to 80% of insurance claims The explan
 ations for delay and cable malfunction are not always readily available wh
 ich is why Windpower Monthly has put together a lessons learned focussed f
 orum. This offshore cable specific event will provide a confidential space
  for full and frank discussion in order to set the standard for best pract
 ice for cable installation and maintenance.\nMore info: windpowermonthlyev
 ents
LOCATION:The Hatton\, 51-53 Hatton Garden\, London\, United Kingdom
GEO:51.5185683;-0.10790380000003097
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=51-53 Hatton Garden\, Londo
 n\, United Kingdom;X-APPLE-RADIUS=100;X-TITLE=The Hatton:geo:51.5185683,-0
 .10790380000003097
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:STANDARD
DTSTART:20121028T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
END:STANDARD
END:VTIMEZONE
END:VCALENDAR