BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-552@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20140212T000000
DTEND;TZID=Europe/Sarajevo:20140214T000000
DTSTAMP:20131028T121211Z
URL:https://navingo.prod.level-level.nl/events/offshore-cable-installation
 -engineering-and-maintenance-2014/
SUMMARY: Offshore Cable Installation\, Engineering and Maintenance 2014
DESCRIPTION:Issues with cables on offshore wind projects can be a nightmare
  and stop generated power reaching the grid. In order to negate these issu
 es you need to make sure they are correctly installed and you have a solid
  maintenance and repair strategy should the worst happen. Windpower Monthl
 y’s 4th annual Offshore Cable Installation\, Engineering And Maintenance
  Forum on 11-12 February promises to be a one-stop-shop to gain all of the
  information needed on this crucial area.\nMore info: windpowermonthlyeven
 ts
LOCATION:London \, .\, UK\, United Kingdom
GEO:55.378051;-3.43597299999999
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=.\, UK\, United Kingdom;X-A
 PPLE-RADIUS=100;X-TITLE=London :geo:55.378051,-3.43597299999999
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:STANDARD
DTSTART:20131027T020000
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
END:STANDARD
END:VTIMEZONE
END:VCALENDAR