BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//wp-events-plugin.com//6.6.5//EN
BEGIN:VEVENT
UID:1-431@navingo.prod.level-level.nl
DTSTART;TZID=Europe/Sarajevo:20121026T000000
DTEND;TZID=Europe/Sarajevo:20121028T000000
DTSTAMP:20120925T150334Z
URL:https://navingo.prod.level-level.nl/events/international-conference-ve
 ssels-for-offshore-wind-park-supply-and-installation/
SUMMARY:International Conference Vessels for Offshore Wind Park Supply and 
 Installation
DESCRIPTION:The offshore wind industry offers to the German ship industry a
  growth potential of 6\,5 billion Euros with classical vessel supply till 
 2020 and has the possibility to save up to 6000 Jobs within the industry.T
 he size and distance from shore of the next generation wind projects provi
 des additional challenges to the offshore wind fleet. This is a challenge 
 that the industry is currently facing\, the cost of hiring vessels is esti
 mated at being between 65 - 270k per day and 150 – 200 million to build 
 per vessel \, a huge cost involvedwithin this sector.\nMore info: vessels4
 offshorewind
LOCATION:Elysée Hotel AG\, Rothenbaumchaussee 10  20148 Hamburg\, Hamburg\
 , Germany
GEO:53.56366999999999;9.990009999999984
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Rothenbaumchaussee 10  2014
 8 Hamburg\, Hamburg\, Germany;X-APPLE-RADIUS=100;X-TITLE=Elysée Hotel AG:
 geo:53.56366999999999,9.990009999999984
END:VEVENT
BEGIN:VTIMEZONE
TZID:Europe/Sarajevo
X-LIC-LOCATION:Europe/Sarajevo
BEGIN:DAYLIGHT
DTSTART:20120325T030000
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR